For Potted Modules (black color) shipped before August of 2012, you can test by applying power to the potted circuit breaker to and if good the following voltages will be seen (be careful...
The SEH is an "electronic holder" (ONLY) that is used to hold open a Fire Rated opening. It requires a door closer to be mounted on the opposite side. It is normally used on an existing opening wit...
Chexit devices shipped after 8-24-2015 with motor driven:If two pin REX connector cable is plugged into the Chexit module and Module REX LED is OFF, the RX switch is defective and needs to be repla...
Chexit devices shipped prior to 8-24-2015 with solenoid driven:If Chexit device goes into alarm with fast flashing red LED after the rearm time, the RX switch may be out of adjustment or defective....
Following could cause the fuse to blow in Von Duprin PS873 power supply. PS873 power supply provides 2AMP at 24VDC or 4AMP at 12VDC. If this limit is exceeded the fuse will blow in the power sup...
One of the following items may cause the EL1490 device to retract then release: Incorrect power supply - Verify you have the PS873-2/4TD or PS914-2RS/4RL power supply. Problems with wire gauge...
One of the following items may cause the EL1690 device to retract then release: Incorrect power supply - Verify you have the PS873-2/4TD or PS914-2RS/4RL power supply. Problems with wire gauge...
Early versions (12/09 ) of the AD200 User Guide in many DEMO kits incorrectly state the Programming sequence to change the a programming code. It shows entering the new programming code o...
EL wiring harness is no longer needed with new EL potted modules.