Installation for L series door and frames

RELATED FAQS

Question
Answer
For compression anchor details refer to the “ANCHORING SYSTEMS”  section in the Steelcraft Tech Data Manual.
Typical installation by an experienced Schlage L lock installer on a door correctly prepped for the Schlage L-Series function could take 10 to 20 minutes.  Many outside variables can change the amo...
Industry standards for hollow metal frames installation tolerances have been developed by both the SDI (Steel Door Institute) and HMMA (Hollow Metal Manufacturers). Both standards are based on the ...
The rough opening dimensions are the same for either Welded (SUA) or Knock Down (KD) frames For F, FN, FE, DE, MU three sided frames and four sided borrowed light frames: New masonry W...
 For DW, K three sided frames and four sided borrowed light frames: Three sided frame = door opening width (order size) plus 1 1/2" minimum to 2" maximum and the door opening hei...
CAUTION must be used in investigating this problem - In most cases, excessive field rusting of products is caused by improper storage at the jobsite. That situation must be validated prior to refus...
Lead lined frames are intended for use in the X-ray Room locations in Health Care facilities. Frames are provided by Steelcraft prepped as follows:  Frames are supplied knock-down (KD). Fram...
Yes, as an option, Steelcraft doors are available with factory prepared for the 98/9949 Concealed Vertical Cable Exit Device. L, B, CE, T and CE-Series doors are available factory prepared Door...
It is always recommended to point installers to the industry installation manuals which are very comprehensive and are ANSI documentsClick here to get the updated link to the Steelcraft Shop M...