The rough opening dimensions are the same for either Welded (SUA) or Knock Down (KD) frames For F, FN, FE, DE, MU three sided frames and four sided borrowed light frames: New masonry Walls: N...
 For DW, K three sided frames and four sided borrowed light frames: Three sided frame = door opening width (order size) plus 1 1/2" minimum to 2" maximum and the door opening height ...
ASTM E-119 is a test standard for walls, partitions and floor or roof systems: This test standard is also used for ceramic type glasses when used as window wall and/or borrowed light frames. ...
Yes. 1 7/16" thick glass but a special rabbet size is required. The size of rabbet required for the frames would depend on the size of the glazing bead being used. For 1" wide glazing stops, ...
Steelcraft have tested different types of doors and frame assemblies using Zero International gasket seals for the various STC ratings. Tests are in accordance to ASTM...
Frames can be installed either KD (knock down) or welded to receive the STC rating.
Steelcraft borrowed light frames are not listed/tested. Check with the glass manufacture if they are listed and with what type of framing used.
Sound seals are required. Zero International Gasket Notes: Perimeter Seals – Zero #475 applies to the stop of the head and jambs. Door bottom – Zero #367, surface applied. Threshold ...
On fire rated transom and/or sidelight frames and fire rated window frames, Steelcraft labeling procedures only control the O/A width and/or height of the frames based on wall condition. The amount...
DW-Series Fire Rated Borrowed Lights are available in the following sizes: 60 minute (1 hour) rating = 2721 square inches of visible glass. maximum frame rabbet to rabbet dimensions = 78 1/4...
Window Frame, Interior Window Frame, Window
POCKET DOOR FRAME: A frame designed to allow a door to slide inside a pocket located within the cavity of a wall. The hinge jamb of the frame is replaced with a 2 piece jamb without a stop. I...
Frame Installation Clearance
This change was implemented in firmware package CO.A.6 (or later) to help the customer in the communication and coupling process between the CO200 (CO250) and the hand held device (HHD). ...
The green LED is to be lit up until the spindle (Triangles and Key Switch) are aligned properly; providing a visual indication of the problem.  
If the mechanical alignment of the triangles on the back of the outside escutcheon are not aligned, the CO200 or CO250 will not connect with the SUS/HHD and will appear to be unresponsive...
In firmware CO.A.6 (or later) the Schlage button on the CO200 (CO250) will turn green anytime that the spindle triangles on the front escutcheon are out of alignment or the mechanical key switch is...
When unlocking the CO200 door by mechanical key override, the green led will be continuously ON until the key is released. This will occur after firmware CO.A.6 (or later) has been installed int...