locknetics power supply

RELATED FAQS

Question
Answer
Wire the Fire Alarm panel back to the “Control In” terminals on the Power Supply.  It needs to be a Normally-Closed dry contact from the Fire Alarm.
For Warranty information, visit us.allegion.com/warranty or contact Customer Service at 877-671-7011.  
It is possible to do, but not advised or supported. The door thickness would have to be enough to accommodate the strike body, then power ran to the strike with an EPT, electri...