ives ept standard prep

RELATED FAQS

Question
Answer
EPT installation guidelines are as follows: Recommended location is 6" below top hinge per template Steelcraft will locate the power transfer prep at the Von Duprin recommended template locati...
Cutout depends on the size of 224 hinge.  See 112HD/224HD-EPT template.  112HD/224HD continuous hinge  Center line of EPT to top of the door  83 inches  30 inches  85 inches  32 inc...
Standard Doors: standard inverted bottom channels will accept the following manufactures automatic door bottoms: National Guard (320) Pemko (420) Zero International (355/354)
Special (custom) option: a special/optional end channel that will support the following manufactures: National Guard (422/423/522) Pemko (443) Zero International (360/364).
The backset is 2 3/4" from edge of door to the center line of the device and strike. The preparation for the WS98/99 strike must be specified when placing order for the frame.
EPT power transfer preparations are not available on the Paladin PW14-Series door and FP14-Series frame. Electrified hinges are available on the Paladin PW14-Series door a...
Yes, a filler plate can be used to cover an EPT prep as long as it is made from the same material as the frame. This information can also be found in NFPA 80 under Chapter 5 for Field Modifications.