Question
Answer
EPT installation guidelines are as follows: Recommended location is 6" below top hinge per template Steelcraft will locate the power transfer prep at the Von Duprin recommended template locati...
The following are quantities of EMA anchors (pierce and dimples) based on range of frame height:  Quantity  Nominal Frame Height     2     1'...
For Steelcraft frame anchor locations refer to the frame "Anchoring Systems" section of Steelcraft's Tech Data Manual pages 2.4.1 thru 201.16.Basic guidelines are as follows:Anchor Quantities:• 3 p...
LCN CAD detailed drawings are internal confidential documents, and are not available.