How do you wire up the new hold open switch on the 4600 units?

The 4600 Series I/O PC Board was updated in Nov. of 2010. As part of that update, the hold open switch plug in connector was removed, requiring the hold open switch to be field wired on the updated 4600 units. If the hold open feature is required, the installer has to field wire the hold open switch by connecting the two wires of the hold open switch to terminals #2 and #6 on the 24 pin terminal block. These connections are called out on instructions and on the label inside the 4600 cover.

DISCLAIMER:

INFORMATION PROVIDED THROUGH THIS SITE IS PROVIDED TO YOU AS IS WITHOUT ANY EXPRESS REPRESENTATIONS OR WARRANTIES OF ANY KIND, AND WE MAKE NO REPRESENTATION OR WARRANTY THAT THIS SITE(OR ANY INFORMATION PROVIDED IN RESPONSE TO YOUR INQUIRY), WILL BE ACCURATE, COMPLETE, OR ERROR-FREE.

YOU AGREE THAT YOU MUST EVALUATE ALL INFORMATION AND RESPONSES, AND THAT YOU BEAR ALL RISKS ASSOCIATED WITH, THE USE OF THIS SITE, INCLUDING ANY RELIANCE ON THE ACCURACY,COMPLETENESS, OR USEFULNESS OF ANY INFORMATION OR MATERIALS MADE AVAILABLE THROUGH THIS SITE.

Other users ask