Frames must include weled in wood or steel stud anchors.
Installation requirements:
Frames must be set before the installation of the drywall.
Frames are not permitted to be installed with screws through the face of the frame after the drywall is installed.
Drywall must penetrate the throat of the frame a minimum of 1/2". These frames must be welded at Steelcraft, whether labeled or non-labeled.
As an alternate to the F-series frame when using wood casing trim to finish frame installations, the C and CK series frame could be used. See the ‘FRAMES’ section of the Steelcraft Tech Data Manual.
DISCLAIMER:
INFORMATION PROVIDED THROUGH THIS SITE IS PROVIDED TO YOU AS IS WITHOUT ANY EXPRESS REPRESENTATIONS OR WARRANTIES
OF ANY KIND, AND WE MAKE NO REPRESENTATION OR WARRANTY THAT THIS SITE(OR ANY INFORMATION PROVIDED IN RESPONSE TO
YOUR INQUIRY), WILL BE ACCURATE, COMPLETE, OR ERROR-FREE.
YOU AGREE THAT YOU MUST EVALUATE ALL INFORMATION AND RESPONSES, AND THAT YOU BEAR ALL RISKS ASSOCIATED WITH, THE
USE OF THIS SITE, INCLUDING ANY RELIANCE ON THE ACCURACY,COMPLETENESS, OR USEFULNESS OF ANY INFORMATION OR MATERIALS
MADE AVAILABLE THROUGH THIS SITE.