Allegion
Terms of Use
Privacy Policy
Frequently Asked Questions
Ask your question
Entering your question as a complete sentence will provide more accurate results than keywords or phrases.
User questions
FAQs
Category List
“
where are steelcraft approval drawings
”
RELATED FAQS
Question
Answer
SHOP DRAWINGS
Resolution:
Approved Submittal Drawing:
Steelcraft field paint instructions
Resolution:
Steelcraft frames and doors are furnished with a high grade, low gloss, baked-on prime paint that provides the best possible protection against corrosion, abrasion and weather, and is an excellent ...:
Do Steelcraft doors and frames meet Florida Building Code (FBC) requirements?
Resolution:
FBC Approvals: Yes, Steelcraft doors do meet the Florida Building Code (FBC) Protocols (TAS 201, TAS 202 & TAS 203) Missile impact & ASTM E-330 applications Dade County NOAs: Yes,...:
What are the Falcon T lock electrical requirements?
Resolution:
Prior to June 2011 the T lock only supported 24V and the electrical requirements were as follows: 0.185 amp @ 24VDC Wire Gage 22 AWG See wiring diagram here - (Previous 2 wire versi...:
Are there autoCAD drawings available for Allegion products?
Resolution:
AutoCAD drawings are proprietary and are not available for distribution. :
Are flush bolts available on the inactive leaf of hurricane double doors with either FBC or NOA approvals?
Resolution:
Ives SB360 surface bolt at top and bottom are the only flush bolts approved for use on H-Series hurricane FBC or NOA applications? The only approved latching hardware for inactive leaf of pairs w...: