Allegion
Terms of Use
Privacy Policy
Frequently Asked Questions
Ask your question
Entering your question as a complete sentence will provide more accurate results than keywords or phrases.
User questions
FAQs
Category List
“
option board intstructions
”
RELATED FAQS
Question
Answer
Why is the 2Q option board required to operate Von Duprin QEL devices?
Resolution:
Communication takes place between the 2Q option board and the Von Duprin QEL exit device. If this communication does not occur then the device will not retract. The 900-2Q board is not ...:
What power supply is required to operate the 6000 series electric strike?
Resolution:
Option boards are not required with PS900 series power supplies when using electric strikes. See the list of options below. The PS902 would power up to 5 electric strikes at 24VDC or&n...:
What are the amperage and power supply requirements for the Von Duprin Chexit (CX) devices?
Resolution:
Chexit motor driven devices shipped after 8-24-2015:You can use 1 Chexit device with PS902, 3 Chexit devices with PS904, and 4 Chexit devices with PS914 or PS906 power supplies with proper gau...:
How many Von Duprin QEL devices can be connected to a power supply?
Resolution:
Product Ordered before 7/10/2012 - Product identified by no label on QEL motor. You must use the 900-2Q option board with the PS900 power supplies to operate the QEL devices. The attached ta...:
Where are the PS914 instructions?
Resolution:
The link to the specific sheet can be found by clicking here: http://us.allegion.com/content/dam/allegion-us-2/web-documents-2/InstallInstructions/Von_Duprin_PS914_Power_Supply_Installation_I...:
Where is the cross reference list for PS800 to PS900 series power supplies?
Resolution:
Von Duprin PS914-4RL power supply replaces the PS873-4TD.:
Are the PS914 and PS873 option boards interchangeable?
Resolution:
The optional boards for PS914 and PS 873 are not interchangeable.: